I've searched past logs and can't find a question/answer that helps.  The "Top Find Calendar Loopers" shows me have 13.99 calendar loops - however I have at least 24 caches on each of my calendar days.  What could be causing this?  Thanks.
ago in Miscellaneous by islandfinders (120 points)

1 Answer

+1 vote
As with all the top lists on Project-GC, the top calendar loopers page does not consider labs, only normal caches.